UI / UX / Strategy

PTC DPM - Digital Production Management

Every plant manager had the same training, and they were all stuck at the same wall


The stated problem: manufacturers stuck at ~60% OEE, chasing an 85% goal.

The real problem: every plant manager had the same Six Sigma training and the same toolkit, so the entire industry could only see the bottlenecks the methodology told them to look for. They didn't know what they didn't know.